Library Catalog
Latest Documents and Publications listed. Use search terms in the box below to find what you need
Mogambo Irrigation Project, Supplementary Feasibility Study Main Report
The principal tasks included in the terms of reference for the supplementary study are summarised below: ol; liUndertake a topographical survey of the whole project area and beyond its boundary, by up to 500 m where necessary. /li; liCarry out a semi-detailed soil survey of the project area including comprehensive in situ and laboratory analyses of soil and water samples./li; li Review the hydrology of the Juba river with particular regard to' the low flow periods and project flooding and the influence of Bardheere dam on the project. /li; liCarry out a preliminary design of the irrigation and drainage system including layout drawings, canal and drain longitudinal and cross-sections, flood protection details, pump station design, typical structure drawings and preliminary details of project infrastructure./li; /ol
Publication Type:
Other
Publication Date:
Author:
Corporate Author:
Sir M MacDonald and Partners Limited
Mogambo Irrigation Project, Supplementary Feasibility Study Annex 4 - Livestock
(Extracts from introduction)The objective of this study was to evaluate the technical and economic feasibility of developing a livestock enterprise within the Mogambo irrigation project. Any livestock enterprise would need to fit into the overall strategy of a state farm, but, of necessity, must also relate to the present and proposed developments of the livestock and agricultural sections in the Lower Juba region. The removal of fodder crops from the cropping pattern at Mogambo has meant that emphasis has now to be placed on crop residues and by-products as the principal source of feed.
Publication Type:
Other
Publication Date:
Author:
Corporate Author:
Sir M MacDonald and Partners Limited
Publication Type:
Other
Publication Date:
Author:
Corporate Author:
Sir M MacDonald and Partners Limited
Publication Type:
Other
Publication Date:
Author:
Watson R. M.
Corporate Author:
Resource Management and Research
Mogambo Irrigation Project, Additional study for and alternative development
The terms of reference for this Additional Study called for two alternatives (A and B) to be investigated. The development for alternative A has been based on the proposals of the Supplementary Study and allows for future expansion to the full area. The development for alternative B has been chosen as the beat area to be implemented independently of any future expansion. Alternative A identifies 2 052 ha net of surface irrigation and 163 ha net of overhead irrigation, and alternative B Identifies 1,809 ha net of surface irrigation end 122 ha net of overhead irrigation.
Publication Type:
Other
Publication Date:
Author:
Corporate Author:
Sir. M MacDonald and Partners Limited
Present and future irrigated agriculture in the Shabelle and Juba rivers
In this report, written after a visit to Somalia to evaluate irrigation potential, the hydrometric data base is questioned as regards both its validity and its representativity. Steps to improve the basic data are proposed which include technical assistance to check and re-establish station ratings over a period of one year. The design plan of the juba high dam is discussed and attention drawn to the necessity of seeking the best professional advice to determine this parameter which has a direct bearing upon the safety and the cost of the dam. Present and proposed irrigation in the Shebelle and Juba valleys are examined.
Publication Type:
Other
Publication Date:
Author:
Henry, J.,C.
Corporate Author:
Food and Agriculture Organization of the United Nations, Rome (Italy), Somali Democratic Republic
Somalia Comprehensive Groundwater Project; Project paper
The goal of the project is to strengthen the capability of the water Development Agency of the Government of Somalia to design and implement a national water resource development program. The Project will assist in the collection of adequate national hydrogeologic, economic and social data and will provide technical assistance and commodities for a production drilling program. Data collected under the will enable the National Water Cormnittee (NWC) to establish priorities for a rational approach to national water resource development
Publication Type:
Other
Publication Date:
Author:
Corporate Author:
Unites State Agency for International Development
Publication Type:
Other
Publication Date:
Author:
Corporate Author:
Sir M MacDonald and Partners Limited
Publication Type:
Other
Publication Date:
Author:
Corporate Author:
Sir M MacDonald and Partners Limited
Publication Type:
Other
Publication Date:
Author:
Corporate Author:
Sir M MacDonald and Partners Limited
Pages

